中文字幕在线国产精品,又湿又紧又大又爽A视频,日韩丝袜欧美人妻制服,成年女人碰碰碰视频播放
        Welcome: Ring of Beijing think-tank, environmental protection equipment co., LTD
        Language: Chinese ∷  English

        News

        Production Process of Carbonized wood outdoor chairs

        "Carbonized wood" gluing properties and surface finishing, good performance, and pine in the heat treatment process, turpentine basically volatile resin has cured, therefore, the resin ducts and Setsuko surface, do not do special sealing process can be directly do finishes. Carbonized wood outdoor chairs in use, it will not happen hot weather resin overflow, destroying the paint surface problems.

        Kiln and tank "carbonized wood" outdoor chair production process are divided into primary drying and secondary drying, charring rapid heating, cooling and conditioning treatment, and then cooling the kiln (tank) 5 phase.

        1 Primary Drying

        From birth (wet) wood dried to approximately 12% (or 10%) moisture phase is called once dry. This stage can be in the kiln carbonization (tank) carried, also accomplished by conventional kiln. Given carbonization kiln (tank) of the cost is higher, and the high cost of equipment operation, so using conventional drying kiln for a more economical, and the drying quality is also easier to control, but the drying time.

        (2) second drying

        From 12% dried to a wood moisture content of 3% (or 4%) of the second drying phase is called. This phase carbonization furnace (tank) to complete. Moisture content of about 12% of the timber into the carbonization kiln, the first transition can be conventional drying. Dry bulb temperature from about 65-75 ℃ Start, and then heated in stages to about 125 ℃, wet bulb temperature gradually expanded to 25 ℃. Subject wood moisture content to about 3%, the secondary drying stage ends. This phase of the length of time, depending on the wood species and thickness, 22mm thick timber normally takes more than 10 hours.

        3 rapid heating carbonization

        Wood moisture content of 3% after, they spent the dry dangerous period. Can quickly heat up, in a relatively short period of time, rising carbonization temperature (usually 180 ~ 212 ℃). Carbonization temperature then held constant for about 3 hours, high temperature heat treatment of wood, the wood of the hemicellulose and amorphous cellulose degradation, wood moisture greatly reduce the number of hydroxyl groups. Meanwhile in wood extractives such as resin, terpenoids, tannins, acids, a large number of objects containing volatile. Thus greatly reduced hygroscopicity of wood, dimensional stability and significantly improved corrosion resistance. This stage, the kiln (tank) to be filled within a protective gas (usually water vapor), oxygen gas must be less than 2%, a simple measure of the kiln to maintain the wet-bulb temperature of 99.5 ~ 100 ℃.Otherwise, there will be very dry wood fire hazard, and the wood under high temperature oxidation, its strength is also unfavorable.

        4 cooling humidity

        Wood carbonization treatment, not only the water content is very low (0.5%), and the wood itself, the temperature is high, close to 180 ~ 212 ℃. Then the humidity can not be directly processed must first timber to cool. Note do not use air cooling, if the kiln outside in the fresh air flow into the kiln, it is easy to make wood fire. The correct way is to stop the radiator heating while spraying atomized water to the kiln, not only play a role in cooling, but also make almost all dry timber proper humidification.Subject to the kiln medium temperature dropped about 116 ℃, humidity conditioning treatment can be carried out. Then the kiln while the saturated water vapor injection, and then atomized water spray in order to enhance the relative humidity of the kiln medium moisture content of wood, and to eliminate the residual stress. Wood moisture content generally be increased from 4 to 5%, to end the humidity treatment.


        CONTACT US

        Contact: Mr Chen

        Phone: 13521257486

        Tel: 010-82921102

        Email: zhitong_chenfei@163.com

        Add: Northwest of Beijing haidian district

        主站蜘蛛池模板: 黄色大片视频| 中文字字幕在线乱码视频| eeuss鲁片一区二区三区69 | 99精品热6080yy久久| 国产高清国产精品国产专区| 国产精品视频一二三区| 亚洲wwwwwww| 免费国产91| 超碰成人人人做人人爽| 丰满爆乳无码一区二区三区| 久久精品一区二区三| 宅男噜噜噜666在线观看| 老司机午夜性大片| 国模晨雨浓密毛大尺度| 精品无码国产自产拍在线观看| 美国色综合| 黄色一级视频网站| 女人被黑人躁得好爽视频| 午夜阳光精品一区二区三区| av一区二区免费| 日韩av成人| 日本在线观看不卡| 国产成人一区二区三区免费| 中文天堂最新版在线www| 99黄色片| 欧美一区二区免费| 色先锋中文字幕| 亚洲精品国产免费av| 亚洲а∨天堂久久精品9966| 99精品乱码国产在线观看| 日日摸天天碰中文字幕你懂的| 毛片a久久99亚洲欧美毛片| 黄色日韩精品| 亚洲欧洲久久久| 色91在线| 国产99久9在线视频 | 传媒| 人妻换人妻仑乱| 国产极品尤物| 视频一区国产精品| 亚洲婷婷小说| 美女把尿囗扒开让男人添|